Current facets (Pre-Master)

Footbridge follows the renovation

Loopbrug volgt de renovatie

Countdown to opening

The renovation of the library building is in full swing. Information about the renovation and images of the new design can now be found in large scale on the footbridge between Theil Building and the library building.

A number of milestones in construction are shown in a timeline, which we will tick off at each realization. This way we follow the progress of the renovation until the opening. The new University Library will open in spring 2017.