Construction Update, November 2016

Left: photos taken on 17 November 2016 at the construction site. Right: design images from the same viewpoint, University Library 2017.

^ The new entrance to the conversion floor with its new staircase.

^ The ground floor in the West wing with the new staircase.

The ground floor of the Rotterdamsch Leeskabinet.

The ground floor in the East wing, with new skylights and an additional void.

^ The first floor in the East wing.

^ The gallery on the first floor of the West wing.